Skip to content
Trace Margin

Newsletter drafts

How should you structure the 90-day pilot?

Trace Margin research deskSection 09Page 19 of 22Last updated

Use stage gates rather than a calendar-based commitment to rollout. This is our suggested operating plan; it is not a claim that every deployment can safely finish in 90 days.

Period Work Evidence required to proceed
January: define and test Baseline current handling; approve permissions; map data; execute synthetic and representative tests Agreed outcome definition, completed risk review, functioning fallback and reproducible test results
February: controlled live traffic Route limited eligible traffic; review failures; reconcile claimed outcomes to records Outcome accuracy, caller effort, transfer acceptance and fully loaded cost remain within approved limits
March: decide Compare against the baseline and a credible alternative; review peak demand and exceptions Explicit expand, repair, hold or stop decision signed by operations and risk owners

What should the measurement ledger contain?

For each unique task, record:

  • Eligibility and reason for exclusion, if excluded.
  • Final outcome: autonomous completion, human-rescued completion, unsuccessful or still pending.
  • Evidence in the scheduling, CRM or service system.
  • Permission or policy violations, including those later corrected.
  • Repeat contacts within a defined, workflow-appropriate observation window.
  • AI, telephony, implementation, monitoring and human-rescue costs.

Our proposed governing metric: total workflow cost divided by unique, correctly completed, policy-compliant tasks. Publish autonomous completion separately so human rescue cannot disappear inside an attractive blended result.

For missed-call recovery, estimate incremental completed jobs against what existing callbacks would have recovered. Keep recovered contribution separate from payroll savings and avoided hiring.